The Owning Entity
Aseer Municipality
The Client
Mahayel Asir Municipality
Summary
During the project, a comprehensive study of the area was prepared, which included a hydrological and hydraulic study of the city of Mahayel Asir. A comprehensive plan was prepared to mitigate the risks of flash floods and the hydraulic works necessary to protect property and lives from the impact of valley runoff in the area.

























